Sungai Brooke
Hydro Power Station

18300, Lojing, Gua Musang, Kelantan, Malaysia

  • Restructure and rehabilitation project from Pesaka Technologies Sdn Bhd with the 21-year Renewable Energy Power Purchase Agreement (REPPA), facilitated by KPMG.
  • In 2015, the plant granted SEDAFIT REPPA rate from Small Renewable Energy Power (SREP) Programme,upgrading generation allowed from 10MW to 12MW.
  • Vertical Pelton turbines ESBI Carbon Solutions, Ireland
  • The project excludes forestry activities, focusing only on developing an access road to the project site, which is less than 5 hectares. Despite the small size, the project management is committed to taking precautions to minimize environmental impact.
  • The proposed project does not involve any water storage or dam construction for the purpose of electricity generation.
  • It is a small-scale run-of-river hydropower plant generating electricity that is sold to the country’s national grid(TNB). The installed capacity is 12MW while maximum output capacity of the project is 10 MW (until 2015), employing 2 vertical impulse Pelton turbines.
  • It is estimated that 47,094t CO2e will bedisplaced by the project activity annually and 988,974t CO2e over the 21 yearsconcessionaire period.
The hydro plant will broadly consist of the following :
  • GravityDiversion Weir
  • Intake, which includes trash racks, a gate and an entrance to a penstock
  • Penstock, which carries the water from the intake to the powerhouse
  • 2 Vertical Impulse Pelton turbines
  • 2 Synchronous Generators
  • Tailrace, which carries the water from the turbine exit back to the river
  • Control Switch gear
  • Transmission/Distribution infrastructure
The technical specifications of the above-mentioned components are provided in the table.